INDEPENDENT THINKING. DISCIPLINED TRADING.
FJThe FundedJournal.Build your foundation

Risk management

Position sizing starts with a loss budget

Work through a hypothetical sizing calculation and understand why contract specifications, costs and account limits matter.

Begin with the amount you could lose

Position sizing connects the distance to your planned stop with a chosen loss budget. The budget should fit your circumstances and leave room within applicable account limits. A percentage copied from another trader is not a substitute for that decision.

A simple hypothetical calculation

For an instrument quoted in dollars per unit, a simplified formula is:

Units = planned price-risk budget ÷ distance from entry to stop.

If an illustrative entry is $100, the planned stop is $98 and the price-risk budget is $40, the calculation gives 20 units. That produces a $40 price loss at the planned stop before costs, assuming execution at that price. These numbers describe no specific available product.

Real instruments need more information

Forex lots, futures contracts and CFDs can have different tick values, lot sizes, quote currencies and minimum order increments. Read the platform’s contract specifications. Convert risk into the account currency and account for commissions and other charges before rounding the size down.

A stop order is not a guarantee of execution at the stop price. Gaps and slippage can increase a loss beyond the planned amount. A simplified formula does not remove that risk.

Include the other trades

Three positions exposed to the same underlying move can behave like one larger position. Review combined risk and distance to any daily or overall equity floor before opening another trade. Also check how pending orders can change exposure if several trigger together.

Build a pre-order checklist

Confirm symbol, account, side, size, stop, estimated costs, open exposure and remaining loss allowance. If the minimum order size is too large for the budget, skip the trade rather than expanding the budget to fit the platform.

Sources and scope

The arithmetic above is an original hypothetical illustration. Contract specifications must come from your platform. Maven users should additionally consult the official help center and terms, reviewed 27 November 2026.

Educational material only. Examples are hypothetical and do not establish an expected return. Read our disclosure.